Engineering
Why three weeks of digital coordination routinely removes three months of site rework.
Jonas Reiter
6 min read

Every contractor has a story about the duct that met the beam. It is usually told with a laugh, long after the cost was absorbed by someone who did not find it funny.
What clash detection actually does
Clash detection overlays the structural, mechanical, electrical and architectural models and flags every place where two objects try to occupy the same space. On a medium-sized building that can mean thousands of clashes in the first run.
Most are trivial. A few hundred are not, and those are the ones that turn into site instructions, re-ordered materials and lost weeks.
Three weeks of coordination on screen routinely removes three months of rework on site.
Where the savings come from
The obvious saving is rework. The less obvious ones are faster procurement, because drawings are trusted, and calmer sites, because trades are not waiting for answers.
What to ask your contractor
Ask who owns the federated model, how often it is updated and how clashes are closed. If the answer is vague, the clashes will be found the expensive way.