Ostra Data Campus

Critical power and cooling installation for a 36 MW data hall.

Eemshaven, NL

2024

MEP installation

Data centre campus lit at dusk seen from above

36

36

MW critical load

120

120

Prefabricated skids

0

0

Days of commissioning delay

A 36 MW data hall with a commissioning date fixed by the client's own customers.

Critical power and cooling were prefabricated off site in skids and tested before they arrived, so site work became assembly.

Fully witnessed integrated systems testing, with every result logged and handed over in a searchable record.

Critical power, Cooling, Prefabrication, Integrated testing